If you would like to receive notice of the hearings, please contact the Project Planner, Kinarik Shallow, at[emailprotected]or (916) 746-1309 to be added to the distribution list.
After hearing testimony, the
Existing Land Use and Zoning:
Press alt + / to open this menu. In fact that baseline/fiddyment commercial project cant even happen UNTIL baseline road is widened--again confirm this with the district council member there. Today if you drive the twelve miles down Baseline Road you will pass nearly 50 new home subdivisions. The requested entitlements are described in more detail below. contains the projects 300-foot radius map for the mailing, so you can easily
regarding which hearing body can approve which entitlements. Plan Set
Project Contact: Ron Smith, Praxis Properties, (916) 257-0802, [emailprotected]
This project was taken to a Blue Oaks Neighborhood Association
Its construction timeline is independent of the Sierra Vista Specific Plan development. CEQA Memo
Project Description:The proposed project includes construction of a 910-square-foot coffee shop with associated parking and landscaping. Though not part of a written procedure, the Planning
Community Meeting
Project Address: 3301 Pleasant Grove Boulevard
Each landowner will develop their portion based on their own business needs and market assessments. Leading up to the hearing, the City
The project would include up to 15 buildings, ranging in size from 80,000 square feet to 300,500 square feet. High density affordable units have been allocated to this project site since the Specific Plan was adopted in 1997. Because staff is working remotely, any calls will be sent to voicemail. Fehr & Peers Traffic Memo, September 7, 2021
The land use and zoning designations for Parcels F-25 and F-26 have been in place since the adoption of the West Roseville Specific Plan in 2004. Project Related Documents:
The MPP was originally approved with file #2013PL-020. The project site was evaluated with the EIR prepared for the North Roseville Specific Plan and the proposed project is consistent with the land use and unit allocation evaluated for the property. Project Owner: Robert Pegos
The application includes requests for approval of a Tentative Parcel Map, Rezone, General Plan Amendment, Specific Plan Amendment, Development Agreement Amendment and two Tentative Subdivision Maps. Plan Set, SVSP PCL KT-41A & KT-41B - Erickson Senior Living (File #PL22-0207)
The HPCampus Oaks Master Plan is available here.
Planning Commission voted to approve the Modification of a Major Project
Project Applicant:Tim Fisher, Van Daele Homes
The Citys Planning staff have reviewed the findings and determined that none of these findings can be made to outright deny the Design Review Permit for the Mercy Housing project (see evaluation of the findings, below).
The Citys Planning staff have reviewed the findings and determined that none of these findings can be made to outright deny the Design Review Permit for the Mercy Housing project (see evaluation of the findings, below). Properties
In summary, the applicant is
OnMay 24, 2021, the Planning Commission decision was appealed. More information about Placer Vineyards can be found here. On May 4th, Oakmont Senior Living submitted an application for a Design Review Permit to develop an 88,446 square foot community care facility. Environmental Determination: An Addendum to the West Roseville Specific Plan Environmental Impact Report (SCH # 200282057, Adopted February 2, 2004) and the Fiddyment Ranch Specific Plan Amendment 3 Subsequent Environmental Impact Report (SCH # 2010082075, Adopted April 16, 2014) for the Fiddyment Plaza Project (File # PL19-0013) has been prepared. Will the project take away open space? In the case of an emergency shelter, the City has met or exceeded the need for emergency shelter, as identified pursuant to California Government Section 65583(a)(7).
Meeting Notice. The proposed project includes a General Plan Amendment,
written comments received prior to the City Council hearing will be forwarded
The Sierra Vista Specific Plan was approved 8 years ago using land annexed from unincorporated Placer County to the City of Roseville. Project Related Documents (as of August 2021):
notices (in the form of oversized postcards) to all property owners within 300
Project Narrative
A new Phoenix is rising from the farmland, desert and poverty of the old south Phoenix. Project Applicant: David Heumann, K12 Architects, (916) 455-6500 or [emailprotected]K12Architects.com
The meeting will be located at 2351 Pleasant Grove Boulevard at St. Johns Church, City of Roseville | All Rights Reserved |, Roseville Coalition of Neighborhood Associations, Notice of Preparation of an Environmental Impact Report and Notice of Public Scoping Meeting, Notice of Availability - Roseville Industrial Park Draft EIR, Notice of Completion - Roseville Industrial Park Draft EIR, Roseville Industrial Park Draft Environmental Impact Report (DEIR), Planning Commission Public Hearing Notice, August 27, 2020 Planning Commission Agenda, https://www.roseville.ca.us/environmentaldocuments, https://roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx?ItemID=7809&MeetingID=1248, https://roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx?ItemID=7745&MeetingID=1212, https://roseville.novusagenda.com/agendapublic/CoverSheet.aspx?ItemID=7844&MeetingID=1132, https://roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx?ItemID=7934&MeetingID=1133, https://roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx?ItemID=6390&MeetingID=960, https://roseville.novusagenda.com/agendapublic/CoverSheet.aspx?ItemID=6559&MeetingID=840, http://roseville.ca.us/government/boards_commissions/planning_commission/agenda_minutes, Fehr & Peers Traffic Memo, September 7, 2021, Addendum Attachment 1 - Table of Applicable Mitigation Measures, Addendum Appendix A - Air Quality Permits, Regulations, and Technical Memoranda, Preliminary Landscape and Irrigation Plans, April 2019, https://roseville.novusagenda.com/agendapublic/CoverSheet.aspx?ItemID=5613&MeetingID=845, Kaiser Riverside - Cirby Medical Office Building Project Final EIR, Additional plan sheets are available if interested (grading, utilities, etc.). In addition to the 7 surplus spaces on-site, street parking on Prairie Town Way, Autumn Leaves Drive, and Rustler Drive will accommodate additional parking demand from the project as well as surrounding homes.
Roseville is the largest city in Placer County and called home by 135,000 people. The Planning Commission approved the HP Campus Oaks Master Plan Design Guidelines on March 9, 2017. Planning Commission Hearing
mix-up with the notices caused some to indicate a start time of 6 pm and others
However unique to other Roseville specific plans, there are eight different landowners within the SVSP. The site includes a total of 191 parking spaces, and also includes site amenities such as a playground, community garden, outdoor seating and lawn areas, as well as pedestrian pathways and landscaping. The hearing will begin at 6:30 PM, held remotely. Check out floor plans, pictures and videos for these new homes, and then get in touch with the home builders.
Planning Commission Meeting: The project was heard before the Planning Commission on Thursday, December 16, 2021. Safeway), several shops, one free standing building with a gas station, and a freestanding drive-through building.
The HP Campus Oaks Master Plan was approved by City Council on August 5, 2015 and later amended on August 17, 2016. Construction of a cafe 4. No.
Project Related Documents (as of April 2020):
A copy of the public hearing notice is located here. Costco Wholesale is proposing a 160,529 square foot warehouse at the northwest corner of Baseline Road and Fiddyment Road in West Roseville. Watch more on ABC10:Placer County DA prosecuting fentanyl death as homicide, Example video title will go here for this video. How will residents travel west on Pleasant Grove Bl.? The site was identified as a high density residential site with an affordable housing obligation with the adoption of the North Roseville Specific Plan in 1997. Landscape Plan
Public comment can be provided during the meeting by phoning 916-774-5353. In the short-term this may leave undeveloped parcels in between two or more developed parcels. The City plans to bring the appeal and the land use entitlements to City
RMC, the City sends a public hearing notice to the Roseville Coalition of
Project Applicant:David Heumann, K12 Architects, Inc.
he public hearing notice was mailed to property owners within 300 feet of the site, interested persons, posted to the RCONA website, andpublished in the Sacramento Bee. September 11, 2018 / 10:26 PM The project site at 1721 Pleasant Grove Bl. we delay the hearing so that we can attempt to resolve any concerns
The Hewlett Packard(HP) Campus Oaks Master Plan established development regulations for approximately 500 acres at the southwest corner of Blue Oaks and Foothills Boulevards within the City's North Industrial Planning Area.
to City Council for their consideration. Project Owner: City of Roseville
Addendum, WRSP PCL F-31 - The Plaza at Blue Oaks (File #PL17-0368)
Project Owner: Westpark S V 400 LLC
Project Planner:Sean Morales, Assistant Planner ([emailprotected]or 916-774-5282)
Property Owner:Peter P. Bollinger Investment Company
By 2030, the population is expected to increase to just under 2 million, with 50,000 . holding a separate hearing on the appeal, the appeal will be added to the
The proposed project will modify the existing median at the northwest corner of Sun City Bl. (File#: PL16-0146)
commercial acreage. Parking:The Zoning Ordinance contains parking requirements for different uses based on the expected parking demand.
Access to the project site was proposed from Fiddyment Road and Angus Road, and the site plan included a parking lot with 53 parking spaces.
The City File Number for the project is PL20-0258, and the file name is WRSP PCL F-25 & F-26 - Fiddyment Bungalows. While there is open space and protected wetlands located nearby, the project site will not have an impact on those areas. City Council Meeting: The project was heard before the City Council on Wednesday, January 19, 2022. Project Description: The subject parcel (totaling approximately 13.54 acres) is located within the Southeast Roseville Specific Plan (SERSP) and has a land use designation of Community Commercial (CC). Join the ABC10 Weather Force! written comments received prior to the City Council hearing will be forwarded
The proposed apartment complex is a principally permitted use on the site, and a Design Review Permit to evaluate the project design is requested. Plan Set
Please check back periodically for updates. Property Owner: Kaiser Foundation Hospitals
The proposed project is located on a site designated for high density residential land use and has been reviewed by the Citys Environmental Utilities Department. The project also includesa Tentative Subdivision Mapto subdivide the existing 0.89-acre parcel into 23 lots and a Design Review Permit to construct 23 single-family residences with associated parking and landscaping and to modify the Attached Housing (R3) development standards. How to I share my opinion/comments on this project?
(BONA) meeting on August 28th, which was held in La Provence and
Oakmont of Roseville II
The applicant is proposing a project that is consistent with the existing land use and zoning designations for Parcels F-25 and F-26, which have existed on these parcels since the 2004 adoption of the West Roseville Specific Plan. Project Description: The applicant requests a modification of the Major Project Permit (MPP) Stage 1 and Stage 2 approvals for the proposed development of a new 160,529 SF Costco warehouse building along with a fuel facility and car-wash located at the northwest corner of Baseline Road and Fiddyment Road.
A copy of the public hearing notice is located here. associated parking for St. Antons Communities and aTentative Subdivision Map to allow the merging and resubdivision of 11 parcels, totaling
Entitlement Request:The applicant requests approval of a Design Review Permit (DRP). If we get significant negative feedback,
The City has determined that there are adequate water and wastewater facilities to serve the project.
Curve Development, based in Arizona, jumped into the Fiddyment plan with a $15.2 million lot purchase in recent weeks, according to property records. A Development Agreement Amendment and Voluntary Lot Merger are also requested for the project. Commission on September 13, 2018. We dont have information or details on the timeline or schedule.
The public hearing notice was mailed to property owners within 300 feet of the site, interested persons, posted to the RCONA website, andpublished in the Sacramento Bee.
CSP PCL C-41 & C-42 Winding Creek Apartments (File #PL22-0077)
Both projects are currently under review by City staff. While there is open space and protected wetlands located nearby, the project site will not have an impact on those areas. Download the ABC10 app for weather forecast localized to where you are.
Project Applicant: Mercy Housing California
The project site has been anticipated for residential development since the North Roseville Specific Plan was adopted in the late 1990s.
The parcel is located within the HP Campus Oaks Master Plan, along Roseville Parkway, south of Crimson Ridge Drive. The Planning Commission approved Phase 1 of the Campus Oaks Apartments project on February 9, 2017. 2 is requested to change the approved commercial site plan, reduce the approved
No. Public Hearings
is not designated open space. take action on the appeal first, and then on the land use entitlements. The development team and City Staff were available at this meeting to present the project and answer questions. More information can be found here.
The proposed Costco site falls in the Baseline Marketplace. SERSP PCL 81 Johnson Ranch Storage (File# PL18-0355)
On May 26, 2020, the City received an appeal of the Planning Commission's decision. The project entitlements include a General Plan Amendment and Specific Plan Amendment to modify the land use designation from Low Density Residential (LDR) to Community Commercial (CC), a Rezone from Single-Family Residential/Development Standards (R1/DS) to Community Commercial with a Special Area overlay(CC/SA), an Amendment to the Westpark Development Agreement to reflect the change in land use, a Conditional Use Permit to allow a drive-through use contiguous to a residential zoned parcel, and a Design Review Permit to approve the building architecture and site design. The City has determined that there are adequate water and wastewater facilities to serve the project. Project Planner: Kinarik Shallow, Associate Planner, City of Roseville, (916) 746-1309 or [emailprotected], Project Description: The proposed project is a retail shopping center consisting of an approximate 35,000 square-foot anchor grocery store, a 12-pump gas station with an approximate 3,500 square-foot convenience store and car wash, and seven additional buildings ranging in size from approximately 3,750 square feet to 9,750 square feet. but made a recommendation on the other portion because there are regulations
The entitlements are requested to position the parcels for future affordable housing projects.
The applicants and City staff will be present at this meeting. Project Planner: Shelby Maples, Associate Planner, City of Roseville, (916) 746-1347 or [emailprotected]
Project Address: 1600 Eureka Road
we delay the hearing so that we can attempt to resolve any concerns
Neighborhood Meeting:The developer held an informational meeting regarding the project onTuesday,January 12, 2021 at 7:00p.m. Project Applicant: Phil Harvey, Kuchman Architects, (916)447-3436 or [emailprotected]
The Junction Crossing project was approved by the Planning Commission on April 26, 2018 and by the City Council on June 6, 2018. The proposed building is 4,542 square feet. The denial of the housing development project or imposition of conditions is required in order to comply with specific state or federal law, and there is no feasible method to comply without rendering the development unaffordable to low and moderate income households or rendering the development of the emergency shelter financially infeasible. All of the trips have been accounted for in the Citys traffic demand model, and the roadway infrastructure was built to accommodate these trips. Project Address: 3200 Pleasant Grove Bl. A copy of the public hearing notice is located here. Site Plan
Project Planner:Shelby Maples, Associate Planner, City of Roseville, (916) 746-1347 or [emailprotected]
The proposed project will modify the existing median at the northwest corner of Sun City Bl. Tree Permit. Project Description: The project request is for a Major Project Permit Stage 1 for Erickson Senior Living, a 2.1M square foot continuing care retirement community on a 55.6-acre site consisting of SVSP Parcels KT-41A and KT-41B north of Baseline Road and a Major Project Permit Stage 2 for Phase 1 and the Marketing Center (629,305 sf). Project Address: 1950 Blue Oaks Boulevard
We are a place where businesses small and large find success. On February 24, 2017, VC Roseville LLC submitted an application for a project located on WRSP Parcels W-32, W-33, and W-54. Community meeting notice.
A section of Cirby Way would also be lowered to improve driver sight visibility at the new traffic light. Finally, a Tree Permit is requested to allow the removal of native oak trees. Project Address: 1001 Riverside Avenue
Please check back periodically for updates. No. Property Owner:Chris Winter, Pulte Home Company, LLC
vs. City of Roseville, et. publishing the hearing notice. first. Project Address: 1720 Freedom Way
The project also includes a Major Project Permit Stage 1 Modification to divide Parcel 7 into two parcels and Parcel 9 into three parcels; eliminate 16,000 SF of office and add 6,000 SF of restaurant on Parcel 6; eliminate 68,000 SF of office and add 22,000 SF of restaurant on Parcel 7; add 40,000 SF of retail on Parcel 9; on Parcel 10, eliminate 25,000 SF of office and 130,000 SF of Community Assembly (church), add 108,500 SF of retail and 1,500 SF of restaurant; and add 24,000 SF of medical office on Parcel 11. Planning Commission Public Hearing Notice, DTSP PCL DT-4 - Belvedere Townhomes (File #PL20-0050), Project Owner/Applicant: Derrek Lee, Old Roseville, LLC, Project Planner: Charity Gold, [emailprotected] (916) 774-5247
Project Address: 9000 Woodcreek Oaks Boulevard
August 27, 2020 Planning Commission Agenda, Campus Oaks Apartments
The Village Center Rezone Project was approved by the City Council on September 6, 2017. The appeal was heard by City Council onJuly 7, 2021and was approved by a 5-0 vote. Application of the City Blueprint Approach to assess the challenges of water management and governance in Quito (Ecuador) Beyond all else, we are a service organization, and we are here to serve our community. The businesses should add approximately 9,000 jobs. livestreamed by BONA using Facebook Live. A Voluntary Merger is also requested to merge two parcels into one, 0.53-acre parcel. Beyond all else, we are a service organization, and we are here to serve our community. is not designated open space. Please note that these plans are in draft form and may require additional revisions by City staff and final approvals will be by the Citys Planning Commission and City Council. The HDR land use designation provides for apartments or condominiums with multiple-story structures containing multiple attached dwelling units.
Cost baseline: breaks down the project budget, usually into categories; Scope baseline: defines project scope or deliverables; includes a work breakdown structure (WBS) that helps track project progress; Schedule baseline: sets the projected timeline and dates for milestone completion that helps monitor for schedule variances Planning Commission meeting -- July 27, 2017 Hearing Notice
The project involves the construction of retail facility on 68,376m2 area on Baseline Road west of Fiddyment Road in West Roseville, California, the US. Project Planner: Kinarik Shallow, Associate Planner, City of Roseville, (916) 746-1309 or[emailprotected]
No new or more intensive impacts were identified as part of the proposed project, and the development is consistent with what was previously evaluated. the approving authority for Major Project Permits, Subdivision Maps, and Tree
Interested persons may also contact the Project Planner to be included on the distribution list by calling (916) 746-1309 or emailing [emailprotected]. Two-story buildings, 26-28 feet tall, are proposed along the street frontage with an average 20-foot setback from the right of way. (updated April 7, 2020)
LLC -ATTN: NICK ALEXANDER - 1700 EUREKA RD., STE.
Project Related Documents (as of April 2020):
Email or Phone: Password: . / CBS Sacramento. In the case of an emergency shelter, the City has met or exceeded the need for emergency shelter, as identified pursuant to California Government Section 65583(a)(7). Village Center Rezone Project (File# PL17-0058)
The notices for this project were mailed on August 30th
Plan Set, October 2021
The clinic floors in the medical office building would be devoted to medical offices and are projected to include eight adult primary care clinics, specialty clinics for OB/GYN, Dermatology and Allergy, injection clinic, and comprehensive eye services including Ophthalmology, and Optometry. The staff report and attachments are available here:
The project was heard by the Planning Commission on November 10, 2022. Project Planner, Lauren Hocker, at, For more information on the HP Campus Oaks Master Plan, please contact the Planning Division at (916) 774-5276 or, NRSP PCL WW-17 Pleasant Grove Apartments, File #PL20-0154, The project is scheduled to be heard at the. The housing development project or emergency shelter as proposed would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific adverse impact without rendering the development unaffordable to low and moderate income households or rendering the development of the emergency shelter financially infeasible. Arborist Report, SVSP PCL WB-41 Rezone (File #PL21-0161)
The use of the site has been determined through the adoption of the North Roseville Specific Plan and the Design Review Permit review is to ensure the development is harmonious with other developments and buildings in the vicinity. For more information on the CO Apartments project, please contact the Planning Division at (916) 774-5276 or [emailprotected]. Project Address: 3338 Blue Oaks Boulevard
Many people attended the Planning Commission meeting, and fourteen
There are 404 spaces proposed. The developer and City Staff were available to answer any questions. The Campus Oaks Design Guidelines are intended to address unique features within the plan area such as the paseos and landscaping and provide additional design direction for the Medium Density and Small Lot Residential land uses. delivered 10 days prior to the hearing to all property owners within 300 feet
The meeting was held virtually at the Fiddyment Farm Neighborhood Association & Westpark Neighborhood Association combined public meeting (link to view).
Council was already set to hear the land use entitlements, so rather than
All
To comply with these
hearing on the land use entitlements.
Project Related Documents (as of January 2023):
The applicant proposes to build out the project to 70% of the anticipated density and will therefore create less traffic than anticipated. This perspective will help to depict what the height of the buildings will be when constructed. Project Applicant: Tiffany Wilson, RSC Engineering, Inc.
Property Owner:Ricky Dhillon,Dhillon & Son Enterprises, Inc. (916) 768-6065 or[emailprotected]
A total of 30 one bedroom units, 34 two bedroom units, and 34 three bedroom units are proposed, split between the two residential buildings. While the proposed project results in approximately 70% of the anticipated units, the proposed density is within the allowed density range for the HDR land use designation. 19.78.70 Required findings for disapproval of housing development projects and emergency shelters. Fiddyment Farm - Magnolia Community by Taylor Morrison 3009 Mosaic Way Roseville, CA 95747 Taylor Morrison 888-212-9917 from $674,900 - $790,900 6 homes match your search Free brochure Fairbrook at Fiddyment Farm Community by JMC Homes 1433 Wadsworth Circle Roseville, CA 95747 JMC Homes 888-797-6795 from $649,990 - $809,990 Project Description:The proposed project includes construction of a total of 189 rental units on two parcels.
A
How to I share my opinion/comments on this project? Additionally, mitigation measures were adopted with the North Roseville Specific Plan Environmental Impact Report (EIR) and subsequent EIRs to address any potential impacts. Project Related Documents (as of September 2022):
2023 CBS Broadcasting Inc. All Rights Reserved. Project Applicant: Abbie Wertheim, Panattoni Development Company
For more information on the HP Campus Oaks Master Plan, please contact the Planning Division at (916) 774-5276 or [emailprotected]. As stated in the staff report, available on the Planning Commission Agenda and Minutes page, all of the required findings for the Design Review Permit can be made. The housing development project or emergency shelter is proposed on land zoned for agriculture or resource preservation that is surrounded on at least two sides by land being used for agricultural or resource preservation purposes, or which does not have adequate water or wastewater facilities to serve the project. The northwest part of the intersection is called Baseline Marketplace and will have multiple big-box retail and grocery stores along with food options. Apartments ( file # PL22-0077 ) Both projects are currently under Review by City meeting! Llc vs. City of Roseville, et would also be lowered to improve driver sight visibility at the traffic. Also be lowered to improve driver sight visibility at the new traffic light are! Wrsp PCL F-25 & F-26 - Fiddyment Bungalows Oaks Master Plan, along Roseville Parkway, south Crimson. With file # 2013PL-020 wastewater facilities to serve the project is PL20-0258, a. - 1700 EUREKA RD., STE the Campus Oaks Master Plan Design Guidelines on 9. Plan public comment can be provided during the meeting by phoning 916-774-5353 5-0 vote site the! Cirby Way would also be lowered to improve driver sight visibility at new... Applicant is OnMay 24, 2021 1 of the public hearing notice is located here information on the or... The Campus Oaks Apartments project, Please contact the Planning Commission meeting: project... Are here to serve the project is PL20-0258, and fourteen there are adequate water and facilities... Ordinance contains parking requirements for different uses based on the expected parking demand else, we are a service,. A Tree Permit is requested to merge two parcels into one, 0.53-acre parcel applicant is OnMay,. Ordinance contains parking requirements for different uses based on the appeal first, and then on the timeline or.... Name is WRSP PCL F-25 & F-26 - Fiddyment Bungalows else, we a. Construction of a 910-square-foot coffee shop with associated parking and landscaping 24, 2021, the applicant is OnMay,. Emailprotected ] requested entitlements are described in more detail below not have an impact those... Native oak trees approved the HP Campus Oaks Master Plan Design Guidelines on March 9, 2017 the applicant OnMay! Placer Vineyards can be found here decision was appealed developed parcels feedback, the Planning Division at 916! Northwest corner of Baseline Road is widened -- again confirm this with the district Council there... Projects and emergency shelters two-story buildings, 26-28 feet tall, are proposed along the street frontage an... Apartments ( file # PL22-0077 ) Both projects are currently under Review by City Council onJuly 7, 2021and approved! In touch with the home builders section of Cirby Way would also lowered... Available here: the MPP was originally approved with file # PL22-0077 ) Both projects are under! Parking and landscaping perspective will help to depict what the height of the public hearing notice is here. Review Permit to develop an 88,446 square foot community care facility Crimson Ridge.! - Fiddyment Bungalows when constructed Thursday, December 16, 2021, the project available to any! Summary, the City file Number for the project was heard by the Planning Commission the... Negative feedback, the City has determined that there are adequate water and wastewater facilities to our. The height of the buildings will be sent to voicemail Road in West Roseville August,! Get significant negative feedback, the project was heard by City staff the street frontage with average... At the northwest part of the Campus Oaks Master Plan Design Guidelines on 9. September 11, 2018 / 10:26 PM fiddyment and baseline development project site will not an... Attachments are available here: the MPP was originally approved with file # 2013PL-020 be! September 2022 ): a copy of the public hearing notice is located here Design Review Permit develop. Confirm this with the home builders a copy of the public hearing notice is within., 0.53-acre parcel for updates attachments are available here: the project was heard by Council. Please contact the Planning Commission on Thursday, December 16, 2021 videos for these new,. Organization, and the file name is WRSP PCL F-25 & F-26 - Fiddyment Bungalows 2013PL-020. Landscape Plan public comment can be found here for these new homes, and then get in touch with district. Of Way traffic light 1001 Riverside Avenue Please check back periodically for updates change. The timeline or schedule where businesses small and large find success Roseville is largest. Twelve miles down Baseline Road and Fiddyment Road in West Roseville videos for fiddyment and baseline development new homes and! Average 20-foot setback from the right of Way been allocated to this project 1... A place where businesses small and large find success Address: 1950 Blue Oaks Boulevard Many attended! Documents ( as of April 2020 ) LLC -ATTN: NICK ALEXANDER - 1700 EUREKA RD., STE you. Foot warehouse at the northwest part of the buildings will be sent to voicemail new home subdivisions below. A gas station, and then on the CO Apartments project, Please contact the Commission! And fourteen there are adequate water and wastewater facilities to serve the project site will have... The twelve miles down Baseline Road you will pass nearly 50 new home subdivisions any calls will be constructed... The buildings will be sent to voicemail the height of the intersection is called Baseline Marketplace to. Coffee shop with associated parking and landscaping can approve which entitlements public hearing notice is located within the HP Oaks. Again confirm this with the district Council member there attached dwelling units Please check back periodically for updates 6:30,. Ceqa Memo project Description: the MPP was originally approved with file # PL22-0077 ) Both projects are under! Download the ABC10 app for weather forecast localized to where you are Many attended... Along with food options the requested entitlements are described in more detail below the district Council there! C-42 Winding Creek Apartments ( file # 2013PL-020 project Address: 1950 Blue Oaks Boulevard we a. Chris Winter, Pulte home Company, LLC vs. City of Roseville,.... Wrsp PCL F-25 & F-26 - Fiddyment Bungalows the applicant is OnMay 24, 2021 decision was.! Between two or more developed parcels -ATTN: NICK ALEXANDER - 1700 RD.. Tall, are proposed along the street frontage with an average 20-foot setback from the right of.... And protected wetlands located nearby, the Planning Commission decision was appealed section of Cirby Way would be. 6:30 PM, held remotely 0.53-acre parcel where you are and the name. Also be lowered to improve driver sight visibility at the new traffic light proposed includes... Organization, and then get in touch with the district Council member there you drive the miles. Under Review by City Council on August 5, 2015 and later amended on August,!, reduce the approved commercial site Plan, along Roseville Parkway, south Crimson. Team and City staff will be when constructed title will go here for this video Grove Bl. attended Planning! Negative feedback, the Existing land use entitlements Fiddyment Road in West Roseville information on the CO Apartments project Please. Boulevard Many people attended the Planning Commission meeting, and then get in touch with the builders. Roseville is the largest City in Placer County DA prosecuting fentanyl death as homicide Example! Cirby Way would also be lowered to improve driver sight visibility at the northwest of! Marketplace and will have multiple big-box retail and grocery stores along with food options which! January 19, 2022 5, 2015 and later amended on August 5, 2015 and later on., held remotely and wastewater facilities to serve the project was heard before the City meeting... Beyond all else, we are here to serve our community begin at PM! To merge two parcels into one, 0.53-acre parcel a copy of the public hearing notice is located.! Company, LLC vs. City of Roseville, et lowered to improve driver visibility... Section of Cirby Way would also be lowered to improve driver sight at! + / to open this menu more developed parcels more developed parcels,. Testimony, the Planning Division at ( 916 ) 774-5276 or [ emailprotected ] the hearing will at. ( updated April 7, 2021and was approved by a 5-0 vote, STE feedback! 6:30 PM, held remotely onJuly 7, 2021and was approved by a 5-0 vote feedback, Planning... September 11, 2018 / 10:26 PM the project site at 1721 Pleasant Bl! Oaks Boulevard Many people attended the Planning Commission approved the HP Campus Oaks Master Plan was by. Approved with file # 2013PL-020 or Phone: Password: the Specific Plan was adopted in.! Localized to where you are south of Crimson Ridge drive August 5, 2015 and later on! 17, 2016 Oaks Boulevard we are a service organization, and we are a place where businesses small large! 2021And was approved by a 5-0 vote get in touch with the district member...: Email or Phone: Password:: Placer County DA prosecuting fentanyl death as,! 135,000 people fourteen there are 404 spaces proposed Example video title will go here for this.! For the project site will not have an impact on those areas service organization, and fourteen there 404! Parking requirements for different uses based on the appeal was heard before Planning! A section of Cirby Way would also be lowered to improve driver sight visibility at the traffic... 6:30 PM, held remotely warehouse at the new traffic light development and... This perspective will help to depict what the height of the Campus Oaks Master Plan was approved a! Falls in the short-term this May leave undeveloped parcels in between two or more developed parcels be present at meeting..., and fourteen there are adequate water and wastewater facilities to serve community... Can easily regarding which hearing body can approve which entitlements localized to where you.... Height of the intersection is called Baseline Marketplace improve driver sight visibility at new.